§ 150.04 APPLICATION REQUIREMENTS.
   (A)   An application for a permit shall be submitted in such form as the building official may prescribe. Such application shall contain the full names and addresses of the applicant and of the owner, and, if the owner is a corporate body, of its responsible officer. The application shall also describe briefly the proposed work and shall give such additional information as may be required by the building official for an intelligent understanding of the work proposed.
   (B)   Applications shall be made by the owner or lessee, or agent of either, or the architect, engineer or builder employed in connection with the proposed work. If such application is made by a person other than the owner in fee, it shall be accompanied by a duly verified affidavit of the owner in fee or the person making the application that the proposed work is authorized by the owner in fee and that the person making the application is authorized to make such application.
   (C)   Submitting plans; plot plan.
      (1)   Applications for permits shall be accompanied by drawings of the proposed work, drawn to scale, showing when necessary, floor plans, sections, elevations, structural details, computations and stress diagrams, as the building official may require.
(Ord. 337, passed 5-19-75)
      (2)   When required by the building official, there shall be submitted a plot plan in a form and size designated by the building official for filing permanently with the permit record, drawn to scale, with all dimensions figured, showing accurately the size and exact location of all proposed new construction and the relation to other existing or proposed buildings or structures on the same lot and other buildings or structures on adjoining property within eight feet of the property line. In the case of demolition, the plot plan shall show the buildings or structures to be demolished and the buildings or structures on the same lot that are to remain.
(Ord. 337, passed 5-19-75; Am. Ord. 352, passed 10-18-76) Penalty, see § 10.99
   (D)   Nothing in this code shall prohibit the filing of amendments to an application or to a plan or other record accompanying same, at any time before the completion of the work for which the permit was issued. Such amendments shall be filed with and be deemed a part of the original application, if approved before the certificate of occupancy has been issued, otherwise a new application for the alteration shall be made and a permit secured.
(Ord. 337, passed 5-19-75)