§ 154.261 UNDERGROUND WIRING.
   Within all condominium and site condominium projects, planned unit developments (PUD), planned industrial developments (PID) and platted subdivisions:
   (A)   The owner/developer shall make arrangements for all distribution lines for electric, telephone and cable TV services to be placed underground entirely through the project area. Such conduits or cables shall be placed within dedicated rights-of-way or within private easements provided to such service companies by the developer. If, in the opinion of the Planning Commission, conditions exist which justify other means of distribution, these requirements may be altered to accommodate such conditions;
   (B)   Conduits or cables placed in the public rights-of-way shall be planned so as not to conflict with other underground facilities;
   (C)   All telephone and electrical facilities shall be constructed in accordance with construction standards approved by the state’s Public Service Commission; and
   (D)   All drainage and underground utility installations which traverse privately owned property shall be protected by easements granted by the owner/developer.
(Ord. passed 12-30-2000, § 5.16.2)