Loading...
SIDEWALKS, CURBS AND GUTTERS
§ 92.40 REQUIREMENTS AND PERMITS.
   No person or entity shall construct, rebuild or repair any sidewalk, curb or gutter, except by employing an experienced builder or contractor who shall perform the construction in accordance with the line, grade, slope and specifications established by the Village Engineer. The builder or contractor shall not construct, rebuild or repair any sidewalk without first obtaining a written permit pursuant to the requirements of the Building Code then in effect, except for with repairs of less than 50 square feet of sidewalk, no permit will be required.
(Prior Code, § 92.35) (Ord. passed 10-3-2000) Penalty, see § 92.99
§ 92.41 SPECIFICATIONS.
   (A)   All sidewalks, curbs and gutters shall be constructed or repaired in conformity with the specifications, and amendments thereto, by the Village Engineer and approved by the Village Council.
   (B)   The specifications will be placed on file with the Clerk of the village.
   (C)   All walks shall be constructed of portland cement construction.
(Prior Code, § 92.36) (Ord. passed 10-3-2000)
§ 92.42 CONSTRUCTION.
   Whenever the Village Council shall deem the construction of a new sidewalk, curb or gutter, or the reconstruction or repair of an existing sidewalk, curb or gutter, a necessary improvement, the Council shall so declare by resolution, describing the property in front of or adjacent to which the construction is ordered by lots, blocks or parcels of land. After adoption of the resolution, it shall be the duty of the Village Clerk to cause notice thereof to be given to each property owner affected, listing the approximate cost of the property owner’s share.
(Prior Code, § 92.37) (Ord. passed 10-3-2000)
Loading...