An application for a Solar Energy System shall be approved or rejected in compliance with the standards and criteria of this Chapter and the application shall include at a minimum the following required items.
(a) A narrative describing the proposed solar energy system, including the number, manufacturer, and model of the solar panels to be installed, and a description of ancillary systems.
(b) A site plan to scale of the subject property showing the planned location of the solar panels, setback lines, proposed and existing ancillary equipment, buildings, and structures.
(c) A description of emergency and normal shutdown procedures and location of electrical disconnection switch.
(Ord. 16-2022. Passed 12-7-22.)