1117.05 STORMWATER MANAGEMENT STANDARDS.
   (a)   Guidelines & Criteria. Design of storm sewers, drainage structures and stormwater management facilities shall be in accordance with requirements of the Municipal Engineer and Service Director.
   (b)   Stormwater Management Policy. No subdivision or development having inadequate storm drainage or other wetness, drainage or flooding impairment shall be approved. The Municipality shall determine if and how stormwater run-off rates or volumes shall be controlled. Ownership and maintenance of drainage and stormwater management features shall be determined prior to final plat approval. (Ord. 21-95. Passed 8-2-95.)
   (c)   Stormwater Erosion Control Policy. In order to control dust, dirt, debris and other excavated materials from depositing upon the public right of way or surrounding properties, all lots having grades greater than eight percent (8%) shall be required to install erosion control silt fencing as determined by the Village Manager or his/her designee. Required erosion control silt fencing shall be installed prior to any excavations taking place and removed when grass, ground cover or landscaping has established underground root growth sufficient to no longer pose a potential erosion problem. (Ord. 34-99. Passed 10-20-99.)