§ 54.20 PERMIT.
   (A)   Permit required. Every gas fitter shall, before doing work of any kind mentioned in this chapter, obtain a permit therefor from the Gas Inspector.
(`85 Code, § 20-83)
   (B)   Application. The person desiring a permit shall file a written application therefor, together with a plan or sketch of the work to be performed with the Gas Inspector.
(`85 Code, § 20-84)
   (C)   Issued; when. The Gas Inspector shall issue a permit for such work upon his or her approval of the plans and specifications accompanying the application therefor; and no such work shall be done in any building without a written permit from the Gas Inspector.
(`85 Code, § 20-85)