§ 154.25 CONSTRUCTION OF IMPROVEMENTS ON SITES.
   All school sites shall be dedicated in a condition ready for full service of electrical, water, sewer, and streets, (including enclosed drainage and curb and gutter) as applicable to the location of the site, or acceptable provision made therefore. The sidewalks and trees normally included within the definition of “improved” sites may be deleted due to the delay time between dedication of any such school site and construction of school facilities thereon.
(Ord. 04-2005, passed 11-15-2005)