Materials and construction procedures shall be in conformance with the general provisions of the village and the Public Works Improvements Design Manual. These material and construction procedures shall be shown on the specification drawings for all improvements.
(Prior Code, § 1252.17) (Ord. 2000-9, passed 9-11-2000) Penalty, see § 153.999