Before any construction on required improvements is started, the construction drawings shall be approved by the responsible officials. The drawings shall be on file with the Planning Commission, the Village Engineer, the Village Administrator, the Village Council, and the State Environmental Protection Agency where water and sanitary sewer main construction are involved. Construction drawings shall be drawn and signed by a registered engineer, including registration number, and shall be in accordance with the Planning Commission’s determination of required improvements.
(Prior Code, § 1252.04) (Ord. 2000-9, passed 9-11-2000) Penalty, see § 153.999