a. The Zoning and Building Administrator
require a
to ensure completion of the site improvements (excluding building). The
take the form of a cash deposit, surety bond, certified check, or an irrevocable bank letter of credit.
b. At the time the building permit application is filed with the
, the applicant
deposit the
with the City Clerk. The amount of the
shall be determined by the
and the
in consultation with the applicant. If the required improvements take longer than six (6) months to complete, the City
shall authorize a rebate of any cash deposit in proportion to the amount of work that has been completed.