§ 1226.08 STREET AND DRAINAGE CONSTRUCTION SPECIFICATIONS AND REQUIREMENTS.
   (a)   A systematic procedure of construction must be followed to produce a satisfactory quality of work.
   (b)   The contractor , at all times during his or her absence from the job site, have, as his or her agent at the job, a competent superintendent or foreman who thoroughly understands the plans and specifications.
   (c)   It be the of the to keep all traffic off the streets until otherwise authorized by the city. Approval of the plat and acceptance of the constructed streets shall be contingent on their condition at the time of final inspection. In the event that any damage is done to the streets by traffic or otherwise, all damage must be repaired before acceptance of the finished .
(Res. passed 11-12-1986)