§ 1226.07 MATERIALS AND INSPECTION.
   (a)   Material requirements.
      (1)   All materials must be approved by the City Engineer or by the city.
      (2)   All materials used must equal or surpass the requirements of MDOT Specifications.
   (b)   Inspection requirements.
      (1)   At the time the final plat is submitted for the approval of the city, an acceptance report be made by the DPW Supervisor or his or her authorized representative concerning the suitability of the streets therein as public highways. In order to provide reliable information on which to base this report, periodic observations and examinations will be made by the city on subdivision projects to assure that streets are satisfactorily constructed. It is recommended that the or his or her authorized representative request such inspection at the completion of each major construction stage. Otherwise approval of the finished   be delayed until it can be determined that the city’s specifications have been complied with.
      (2)   The city will require a reasonable (24-hour minimum) notice prior to inspecting any construction stage or the finished .
      (3)   No inspection will be provided on Sunday or on legal holidays.
      (4)   Requests for inspection will not be granted on any proposed plat for which and drainage plans have not been approved by the city.
(Res. passed 11-12-1986)