(a) The
or its designate
use the policy, criteria and information, including technical specifications and standards, in the Genesee County Storm Water and Flood Control Design Standard Requirements (GCSWSR) as the basis for decisions about storm water permits and about the design, implementation and performance of structural and non-structural storm water BMPs.
(b) The State LID Manual includes a list of storm water treatment practices, including the specific design criteria for each them. Storm water treatment practices that are designed and constructed in accordance with these design and sizing criteria should meet the minimum water quality and channel protection performance standards outlined in the Genesee County Storm Water and Flood Control Design Standard Requirements and the federal Phase II Storm Water Rules. Calculations to demonstrate that BMP designs will perform to meet required water quality, channel protection and
control standards are to be submitted to the appropriate reviewing agency. Failure to construct storm water treatment practices in accordance with these standards
subject the violator to a civil penalty as described in §§ 1046.090 through 1046.096.
(Ord. 1411-04, passed 12-10-2014)