§ 1046.042 FLOODPLAIN AND SENSITIVE AREAS STANDARDS.
   (a)   All new buildings and substantial to existing buildings be protected from damage up to the and shall be in accordance with all applicable federal, and local ordinances, and rules and regulations. Floodway alteration shall be permitted only upon review and approval by the , in accordance with an approved .
   (b)   A providing for the filling or alteration of a floodway include provisions for maintaining stability of the banks of streams or other water bodies, by means of the establishing of buffer zones and other means of providing protection of the slopes and banks of water bodies.
   (c)   Within any required buffer zone, no   take place except in accordance with the approved . Such a   also include provisions for the replacement of storage volume, where such storage volume is lost or diminished as a result of approved development.
   (d)   Where appropriate, permanent setbacks based on site slopes and soils will be established in accordance with the specifications outlined in the Genesee County Storm Water and Flood Control Design Standard Requirements (GCSWSR).
(Ord. 1411-04, passed 12-10-2014)