1284.04   GENERAL DEVELOPMENT STANDARDS.
   The following standards represent broad parameters under which all PUD developments must be designed:
   (a)   Central Water and Sewer Facilities. All structures in developments approved as a PUD must be served by central public water and sewer facilities. No package wastewater treatment plants or separate water supply systems, private or public shall be allowed.
   (b)   Development Layout and Design. The design and layout of all PUDs shall display excellence in design by properly considering significant site features, such as topography, natural drainage patterns, roadway access and circulation, surrounding land uses, and general public welfare to result in desirable land development. Attractive landscaped buffers shall be provided between incompatible land uses and activities.
   (c)   Front, Side, and Rear Setback Standards for Lots. All lots located in any PUD shall have minimum front, side, and rear setbacks as determined by Planning Commission and Council.
   (d)   Off-Street Parking and Loading Facilities. For all land uses within the PUD, standards set forth in Chapter 1290 shall apply as determined to be applicable by Planning Commission and Council.
(Ord. 01-014. Passed 7-17-01; Ord. 21-007. Passed 5-18-21.)