§ 151.075 IMPROVEMENT REQUIREMENTS.
   The improvements required by this section shall be installed in all subdivisions. All improvements shall meet minimum town standards and specifications as directed by the Town Engineer and shall be installed within one year from the date of final approval of the subdivision. Provided, however, that upon a showing of good and sufficient cause, the Town Council may grant an extension of the time limit not to exceed six months. Financial assurances guaranteeing the construction of all required improvements shall be required as a condition of approval. Said assurances shall be in accordance with the provision of §§ 151.100 through 151.105.
(Ord. 02-01-2021 SD, passed - -2021)