§ 151.062 APPLICATION FOR PERMITS.
   (A)   Applications shall include a plan illustrating the shape, size, dimensions and location of the lot, location and dimensions of existing and proposed buildings and structures, conditions existing on the lot and adjacent lots, general area of vegetative cover and buffers if applicable, the boundaries of flood hazard areas (see § 151.081), proposed dwelling units, office or commercial units, easements, setback lines or adjacent structures, off-street parking spaces and all other information required to determine compliance with this chapter.
   (B)   A scaled plan is only necessary for new construction, commercial and light industrial applications.
   (C)   Application, permit and inspection procedures for specific types of construction are detailed in the respective Procedures Manual, available from the Zoning Administrator.
      (1)    Zoning, development, building or occupancy permit shall be issued upon determination by the Zoning Administrator that all provisions of this, and all other city ordinances, are complied with, and any required fees are paid. The Zoning Administrator shall state reasons for refusal of a permit in writing.
      (2)   Before commencing any actions described in § 151.061, the required permit (or copy thereof) shall be placed conspicuously on the front property line therein described for the project duration, in a manner to protect it from weather.
      (3)   Permits and certificates of occupancy issued based on plans and applications approved by the city, and by other officers or agencies where additional approval is required, shall authorize only the use, arrangement, location and construction set forth in the approved plans and applications, and no other use, arrangement, location or construction shall be authorized unless the approvals have been obtained.
(1985 Code, Art. IV, § 403) (Ord. 99-005, passed 4-13-1999)