Every street excavation shall be refilled as soon as possible after the work is completed and paving, sidewalks and appurtenances shall be replaced in at least as good condition as before the excavation to the satisfaction of the city. All dirt and debris shall be removed immediately. Any person who fails to comply with these requirements within 24 hours after notice from the city shall be liable to the city for the full cost incurred by the city to remedy the defect and restore the street, sidewalk, alley or public ground to its proper condition. The cost shall be an obligation of the surety on the bond of the applicant.
(2001 Code, § 6.01) Penalty, see § 10.99