§ 151.31(3) MANUFACTURED HOMES.
   (A)   New or replacement manufactured homes shall be elevated so that the reference level of the manufactured home is no lower than the regulatory flood protection elevation, as defined in § 151.05 of this chapter.
   (B)   Manufactured homes shall be securely anchored to an adequately anchored foundation to resist flotation, collapse, and lateral movement in accordance with the most current edition of the State of North Carolina Regulations for Manufactured/Mobile Homes, adopted by the Commissioner of Insurance pursuant to G.S. § 143-143.15. Additionally, when the elevation would be met by an elevation of the chassis 36 inches or less above the grade at the site, the chassis shall be supported by reinforced piers or engineered foundation. When the elevation of the chassis is above 36 inches in height, an engineering certification is required.
   (C)   All foundation enclosures or skirting below the lowest floor shall be in accordance with § 151.31(4).
   (D)   An evacuation plan must he developed for evacuation of all residents of all new, substantially improved or substantially damaged manufactured home parks or subdivisions located within flood prone areas. This plan shall be filed with and approved by the Floodplain Administrator and the local Emergency Management Coordinator.
(Ord. 2018-24, passed 5-21-18)