(A) Infiltration/inflow elimination during construction. During any new construction, renovation or demolition the property connection or connections to the sanitary sewer shall be protected through the use of a cover plug in order to eliminate the potential for inflow to enter the sanitary sewer system. Any such water collected shall not be allowed to enter the sanitary sewer system at any time.
(B) Sump pump requirements for new construction. All new buildings with groundwater sump systems are required, prior to final inspection by city personnel, to have the sump pump installed.
(Ord. 56, passed 9-2-1997)