One of the following options for vector attraction reduction must be met when septage is land applied:
(A) Injection. Septage must be injected into the soil. No significant amount of septage can be present on the soil surface within one hour after injection has taken place.
(B) Immediate incorporation. Septage must be incorporated by tillage within six hours after surface application.
(C) Lime stabilization. The pH of the septage must be raised to 12.0 or higher by alkali addition and without the addition of more alkali must remain at 12.0 or higher for 30 minutes.
(Ord. 1, passed 3-25-2015)