When a new building is being constructed, a water meter shall be set in a place approved by the Director of Public Works at the expense of the consumer to measure the water used during construction. Water so used shall be charged to the consumer at the usual rate.
(Ord. 192, passed 2-15-93; Am. Ord. 312, passed 5-17-10) Penalty, see § 52.99