1313.05  PERMIT FOR PLACING OF ROOFING MATERIALS.
   A building permit shall be required for the placement of roofing materials (roof or reroof).  The permit fee would be based on the total cost of the job using the fee schedule in the Engineer's office as per Section 1305.02.  The penalty for not obtaining a permit would be the same as for other building permits under Article 18 of the Zoning Ordinance.
(Ord. 6315-91.  Passed 11-25-91.)