1137.02 SURVEY MONUMENTS.
   (a)   A complete survey shall be made by a registered surveyor.
   (b)   The traverse of the exterior boundaries of the tract and of each block, when computed from field measurements of the ground, shall close within a limit of error of 1 foot to 10,000 feet of the perimeter before balancing the survey.
   (c)   Perimeter reference monuments shall be located and placed within the subdivision. The number and location of permanent reference monuments shall be determined in consultation with the Zoning Administrator and their location noted on the record plan. The monuments shall be placed immediately after final grading of lots is completed and the cost of the monuments will be included in the cost of improvements. There shall be no release of performance bond until after the monuments have been placed.
   (d)   A solid iron pin monument, topped with a plastic cap bearing the surveyors name and register number, shall be placed by the surveyor at all points on boundary lines where there is a change of direction and at all lot corners before the performance bond is released by the Village. Prior to bond release, a surveyor's certified statement shall be filed with the Zoning Administrator attesting that all required monuments and iron pins are in place. Iron pins and monuments shall be flagged.
   (e)   Prior to placement of solid iron pin monuments each corner of a lot abutting a proposed public street shall be indicated by clearly identifiable markers with lot numbers on the appropriate side of the markers. Markers may be removed when pins are placed.
(Ord. 31-2007. Passed 12-20-07.)