§ 150.042 APPROVALS REQUIRED.
   No work shall be done on the building or structure beyond the point indicated on each successive inspection without obtaining the written approval of the Building Inspector. Such written approval shall be given only after an inspection shall have been made of each successive step in the construction, as indicated by each of the inspections required in § 150.044. A survey of the lot may be required by the Building Inspector to verify compliance of the structure with approved plans, which survey shall include the staking of all property corners by the surveyor.
(Prior Code, § 150.062) Penalty, see § 150.999