§ 153.65  AS-BUILT REQUIREMENTS.
   (A)   Prior to issuance of a use and occupancy permit, or final release of bond, the as-built condition, including invert elevations, size, shape, and location of critical storm water management features, must be identified and approved.
   (B)   The volume, slopes, configuration, condition, and topographic information of all detention, retention, and water quality practices shall be certified by a licensed professional engineer. This information shall be provided to the town in the form of an as-built drawing or other electronic form accepted/required by the town. The as-built certification shall indicate if final conditions are consistent with, or exceed, the SWQMP provisions.
   (C)   If it is determined that information provided in the as-built drawing, certification, inspection, or survey of the site do not meet or exceed the SWQMP provisions, the town reserves the right to withhold certification of occupancy or release of final bond. Furthermore, other enforcement mechanisms, as identified within this chapter, may be initiated to ensure compliance.
   (D)   If upon inspection by the town, or its designated representative, it is determined that acceptance of site conditions is inappropriate by virtue of deficiencies, the permittee shall continue inspections and maintenance, as described in the SWQMP, pending such acceptance.
(Ord. G-12-02, passed 1-17-2012)