(A) If available, each SWPPP shall be evaluated for consistency with the storm water master plan or watershed study for the major watershed or watersheds within which the project site is located. The individual project evaluation will determine if storm water quantity and quality management practices can adequately serve the property and limit impacts to downstream public and private properties. The presence of a regional facility(s) will be considered in determining the extent to which quantity and/or quality controls will be necessary.
(B) Special design criteria or requirements may be applied to storm water quality BMPs based on the direction or results of master plans, watershed studies and/or total maximum daily load (TMDL) requirements.
(Ord. G-12-02, passed 1-17-2012)