4-1-9: FEES:
BUILDING VALUATION AND FEES
BUILDING VALUATION AND FEES
VALUATIONS
All valuations are as stated in the February 2020 ICC Building Valuation Table as published, with the following additions and modifications:
Foundations (new construction, not including manufactured home installation/foundation, is exempt from foundation valuation):
Crawlspace (Headroom < 7 feet)
$100.00 per lineal foot up to 4 ft. in height plus $10.00 per lineal foot for each additional foot in height
Foundation repair / retaining wall
Unfinished basement
50% of the value of finished residential space
Moved Building
$30.00/sq. ft.
Decks
$12.50/sq. ft.
Porch Cover/Deck Cover
$12.50/sq. ft.
Pole Buildings
$20.00/sq. ft.
Group OSA
$65.00/ sq. ft.
 
TABLE 1-A - BUILDING PERMIT FEES
Total Valuation
Base Fee
Additional Units/ Fractions Thereof
TABLE 1-A - BUILDING PERMIT FEES
Total Valuation
Base Fee
Additional Units/ Fractions Thereof
$1.00 to $500.00
$50.00
 
$501.00 to $2,000.00
$50.00 for the first $500.00
$1.30 for each additional $100.00
$2,001.00 to $25,000.00
$69.25 for the first $2,000.00
$14.00 for each additional $1,000.00
$25,001.00 to $50,000.00
$391.25 for the first $25,000.00
$10.10 for each additional $1,000.00
$50,001.00 to $100,000.00
$643.75 for the first $50,000.00
$7.00 for each additional $1,000.00
$100,001.00 and up
$993.75 for the first $100,000.00
$7.00 for each additional $1,000.00
 
GENERAL FEES
GENERAL FEES
Plan Review All structures requiring a plan review shall be charged an additional 65% of the permit fee for such
65% of permit fee
Non-refundable fee deposit for commencement of the plan review for projects exceeding $30,000 in valuation
$700.00
Temporary Certificate of Occupancy
$100.00
Temporary Certificate of Occupancy extension
$200.00
Re-Roof
$50.00
Siding
$50.00
Window Replacement (No Change in Size)
$50.00
Manufactured/Modular Home Installation
$100.00 per section
Residential Wind & Telecommunication Towers
$2.00 per ft. in elevation above ground level measured to the highest point of any part of the tower including the blades of any wind turbine $100.00 minimum
Commercial Telecommunication Towers & Electric Generating Wind Turbines
$11.00 per ft. in elevation above ground level measured to the highest point of any part of the tower including the blades of any wind turbine.
$100.00 minimum
Solar System Installation
$50.00
Detached Pre-Manufactured Accessory Structures (Not pre-built)
$50.00 (10' walls up to 400sq.ft.)
Wood stove/Pellet Stove Inspections
$50.00
Signs: If a permit is required:
$50.00
Residential Fences (Over 7 ft.)
$50.00
Permit extension- Maximum (3)
$50.00 each
Permit renewal - prior to expiration
25% of the original permit fee; $100 minimum
Permit renewal expired to 5 years
50% of the original permit fee; $100 minimum
Permit renewal expired > 5 years
Full permit fee
Work commencing without a permit
25% of the permit fee
Appeals
$150.00
Alterations/Remodels Level 1
10% of full permit fee based on square footage
Alterations/Remodels Level 2
45% of full permit fee based on square footage
Alterations/Remodels Level 3
90% of full permit fee based on square footage
Additions, alterations, or other items not specified in the fee schedule where square footage on building valuation data sheets cannot be used, shall be valued at the bona fide contractual price or by doubling material costs to account for labor costs.
Other Inspections and Fees:
Inspections outside of normal business hours
$75.00 per hour -minimum charge-two hours
Reinspection fees
$75.00 per hour
Inspections for which no fee is specifically indicated
$75.00 per hour -minimum charge-one hour
Additional plan review required by changes, additions, or revisions to plans
$75.00 per hour
Building Department use of outside consultants for plan review, inspection, or both
Actual costs. Actual costs include all actual costs plus administrative and overhead costs
Foundation Inspection: Real Property
$100.00
 
MECHANICAL PERMIT FEES
Description of equipment
Each
MECHANICAL PERMIT FEES
Description of equipment
Each
Minimum permit fee for all mechanical permits is total fees listed below or $50.00 whichever is greater
Residential Furnace including vent/ducts
$20.00
Residential Boilers
$20.00
Suspended, wall, floor mount or radiant heater
$15.00
Ground Loop Heat pump, hydronic piping
$15.00
Gas appliances (range, water heater, dryer, barbecue, log lighter, fireplace, inserts, pool/spa heater, other)
$15.00
Air-Handlers (electric furnace)
$15.00
Heat pump, air conditioner, evaporative cooler
$15.00
Heat Recovery Unit
$15.00
Solid fuel fireplaces, stoves, inserts
$25.00
Chimney (liner, flue, vent)
$15.00
Ductwork
$15.00
Appliance Vents
$15.00
Gas piping system, 1-4 outlets
$10.00
Each additional outlet over 4
$2.00
Other (non-specified equipment)
$15.00
Permit Processing Fee
$25.00
Special inspection per hour
$50.00
 
   BUILDING VALUATION DATA - FEBRUARY 2020
   Square Foot Construction Costs
Group (2018 International Building Code)
IA
IB
HA
MB
MIA
1MB
IV
VA
VB
   BUILDING VALUATION DATA - FEBRUARY 2020
   Square Foot Construction Costs
Group (2018 International Building Code)
IA
IB
HA
MB
MIA
1MB
IV
VA
VB
A-1 Assembly, theaters, with stage
$247.86
$239.47
$233.25
$223.81
$210.17
$204.10
$216.62
$195.46
$188.40
A-1 Assembly, theaters, without stage
$227.10
$218.71
$212.49
$203.05
$189.41
$183.34
$195.86
$174.70
$167.65
A-2 Assembly, nightclubs
$191.96
$186.56
$182.12
$174.70
$164.94
$160.39
$168.64
$149.29
$144.33
A-2 Assembly, restaurants, bars, banquet halls
$190.96
$185.56
$180.12
$173.70
$162.94
$159.39
$167.64
$147.29
$143.33
A-3 Assembly, churches
$229.69
$221.30
$215.08
$205.64
$192.37
$187.27
$198.45
$177.66
$170.60
A-3 Assembly, general, community halls, libraries, museums
$192.20
$183.81
$176.59
$168.15
$153.51
$148.44
$160.96
$138.80
$132.75
A-4 Assembly, arenas
$226.10
$217.71
$210.49
$202.05
$187.41
$182.34
$194.86
$172.70
$166.65
B Business
$200.26
$192.96
$186.54
$177.38
$161.90
$155.84
$170.40
$142.43
$136.08
E Educational
$209.90
$202.64
$196.82
$188.34
$175.49
$166.60
$181.86
$153.45
$148.75
F-1 Factory and industrial, moderate hazard
$117.60
$112.19
$105.97
$101.84
$91.54
$87.26
$97.61
$75.29
$70.95
F-2 Factory and industrial, low hazard
$116.60
$111.19
$105.97
$100.84
$91.54
$86.26
$96.61
$75.29
$69.95
H-1 High Hazard, explosives
$109.99
$104.58
$99.35
$94.22
$85.14
$79.87
$89.99
$68.89
N.P.
H234 High Hazard
$109.99
$104.58
$99.35
$94.22
$85.14
$79.87
$89.99
$68.89
$63.56
H-5 HPM
$200.26
$192.96
$186.54
$177.38
$161.90
$155.84
$170.40
$142.43
$136.08
1-1 Institutional, supervised environment
$197.83
$191.05
$185.12
$177.91
$163.28
$158.81
$178.06
$146.98
$142.33
I-2 Institutional, hospitals
$335.53
$328.23
$321.81
$312.65
$296.45
N.P.
$305.67
$276.99
N.P.
I-2 Institutional, nursing homes
$233.12
$225.82
$219.40
$210.24
$195.51
N.P.
$203.26
$176.05
N.P.
I-3 Institutional, restrained
$227.71
$220.41
$213.99
$204.83
$190.84
$183.78
$197.85
$171.37
$163.02
I-4 Institutional, day care facilities
$197.83
$191.05
$185.12
$177.91
$163.28
$158.81
$178.06
$146.98
$142.33
M Mercantile
$142.95
$137.54
$132.11
$125.68
$115.38
$111.83
$119.62
$99.73
$95.77
R-1 Residential, hotels
$199.70
$192.92
$186.99
$179.78
$164.90
$160.43
$179.93
$148.60
$143.96
R-2 Residential, multiple family
$167.27
$160.49
$154.56
$147.35
$133.71
$129.23
$147.50
$117.40
$112.76
R-3 Residential, one- and two-family
$155.84
$151.61
$147.83
$144.09
$138.94
$135.27
$141.72
$130.04
$122.46
R-4 Residential, care/assisted living facilities
$197.83
$191.05
$185.12
$177.91
$163.28
$158.81
$178.06
$146.98
$142.33
S-1 Storage, moderate hazard
$108.99
$103.58
$97.35
$93.22
$83.14
$78.87
$88.99
$66.89
$62.56
S-2 Storage, low hazard
$107.99
$102.58
$97.35
$92.22
$83.14
$77.87
$87.99
$66.89
$61.56
U Utility, miscellaneous
$84.66
$79.81
$74.65
$71.30
$64.01
$59.80
$68.04
$50.69
$48.30
 
(Ord. 424, 12-15-2020)