All valuations are as stated in the February 2023 ICC Building Safety Journal, with the following additions and modifications: | |
Foundations (new construction, not including manufactured home installation/foundation, is exempt from foundation valuation): | |
Crawlspace (Headroom < 7 feet) | $100.00 per lineal foot up to 4 ft. in height plus $10.00 per lineal foot for each additional foot in height |
Foundation repair / retaining wall | |
Unfinished basement | Same as R-3 valuation |
Moved Building | $65.00/sq. ft. |
Decks | $12.50/sq. ft. |
Porch Cover/Deck Cover | $12.50/sq. ft. |
Pole Buildings | $24.00/sq. ft. |
Group OSA | $75.00/ sq. ft. |
Shell Only Buildings | No reduction |
Swimming Pool | $24.00/sq. ft. based on surface area |
Solar Panels | $5.00/sq. ft. based on surface area of panels |
TABLE 1-A - BUILDING PERMIT FEES
| ||
Total Valuation | Base Fee | Additional Units/ Fractions Thereof |
TABLE 1-A - BUILDING PERMIT FEES
| ||
Total Valuation | Base Fee | Additional Units/ Fractions Thereof |
$1.00 to $500.00 | $50.00 | |
$501.00 to $2,000.00 | $50.00 for the first $500.00 | $1.30 for each additional $100.00 |
$2,001.00 to $25,000.00 | $69.25 for the first $2,000.00 | $14.00 for each additional $1,000.00 |
$25,001.00 to $50,000.00 | $391.25 for the first $25,000.00 | $10.10 for each additional $1,000.00 |
$50,001.00 to $100,000.00 | $643.75 for the first $50,000.00 | $7.00 for each additional $1,000.00 |
$100,001.00 and up | $993.75 for the first $100,000.00 | $7.00 for each additional $1,000.00 |
GENERAL FEES
|
GENERAL FEES
| |
Plan Review All structures requiring a plan review shall be charged an additional 65% of the permit fee for such | 65% of permit fee |
Non-refundable fee deposit for commencement of the plan review for projects exceeding $30,000 in valuation | $700.00 |
Temporary Certificate of Occupancy | $100.00 |
Temporary Certificate of Occupancy extension | $100.00 |
Fee for moving into residence prior to obtaining a temporary or regular certificate of occupancy | $200.00 plus the cumulative fees that would have been paid for a temporary certificate of occupancy |
Temporary Living Quarters with a valid permit and each extension | $50.00 |
Re-Roof | $50.00 |
Metal roll off container up to 8' x 40' unmodified; up to 2 detached with residential eligible parcel. Used as other than storage or modified shall be charged as specified under the other occupancy. | $100.00 each container |
Siding | $50.00 |
Window Replacement (No Change in Size) | $50.00 |
Manufactured/Modular/Mobile Home Installation | $100.00 per section (foundations charged separately) |
Residential Wind & Telecommunication Towers | $2.00 per ft. in elevation above ground level measured to the highest point of any part of the tower including the blades of any wind turbine $100.00 minimum |
Commercial Telecommunication Towers & Electric Generating Wind Turbines | $11.00 per ft. in elevation above ground level measured to the highest point of any part of the tower including the blades of any wind turbine. $100.00 minimum |
Metal Open-Sided Carport Kits that meet Snow Load | $50.00 (10' walls up to 400 sq. ft.) |
Wood stove/Pellet Stove Inspections | $50.00 |
Signs: If a permit is required: | $50.00 |
Fences (Over 7 ft.) | $50.00 |
Permit extension- Maximum (3) | $50.00 each |
Permit renewal - prior to expiration | 25% of the original permit fee or $100 per each inspection left; $100 minimum |
Permit renewal expired to 5 years | 50% of the original permit fee; $100 minimum |
Permit renewal expired > 5 years | Full permit fee |
Work commencing without a permit | 25% of the permit fee |
Appeals | $500.00 |
Alterations/Remodels Level 1 | 10% of full permit fee based on square footage |
Alterations/Remodels Level 2 | 45% of full permit fee based on square footage |
Alterations/Remodels Level 3 | 90% of full permit fee based on square footage |
Additions, alterations, or other items not specified in the fee schedule where square footage on building valuation data sheets cannot be used, shall be valued at the bona fide contractual price or by doubling material costs to account for labor costs. | |
Other Inspections and Fees: | |
Inspections outside of normal business hours | $75.00 per hour -minimum charge-two hours |
Reinspection fees | $75.00 per hour |
Inspections for which no fee is specifically indicated | $75.00 per hour -minimum charge-one hour |
Additional plan review required by changes, additions, or revisions to plans | $75.00 per hour |
Building Department use of outside consultants for plan review, inspection, or both | Actual costs. Actual costs include all actual costs plus administrative and overhead costs |
Foundation Inspection: Real Property | $100.00 |
Fee for paper plan submittal for plans over 11x17 in size | $50.00 |
MECHANICAL PERMIT FEES
| |
Description of equipment | Each |
MECHANICAL PERMIT FEES
| |
Description of equipment | Each |
Minimum permit fee for all mechanical permits is total fees listed below or $50.00 whichever is greater | |
Residential Furnace including vent/ducts | $20.00 |
Residential Boilers | $20.00 |
Suspended, wall, floor mount or radiant heater | $15.00 |
Ground Loop Heat pump, hydronic piping | $15.00 |
Gas appliances (range, water heater, dryer, barbecue, log lighter, fireplace, inserts, pool/spa heater, other) | $15.00 |
Air-Handlers (electric furnace) | $15.00 |
Heat pump, air conditioner, evaporative cooler | $15.00 |
Heat Recovery Unit | $15.00 |
Solid fuel fireplaces, stoves, inserts | $25.00 |
Chimney (liner, flue, vent) | $15.00 |
Ductwork | $15.00 |
Appliance Vents | $15.00 |
Gas piping system, 1-4 outlets | $10.00 |
Each additional outlet over 4 | $2.00 |
Other (non-specified equipment) | $15.00 |
Permit Processing Fee | $25.00 |
Special inspection per hour | $50.00 |
BUILDING VALUATION DATA - FEBRUARY 2020 | |||||||||
Square Foot Construction Costs | |||||||||
Group (2018 International Building Code) | IA | IB | HA | MB | MIA | 1MB | IV | VA | VB |
BUILDING VALUATION DATA - FEBRUARY 2020 | |||||||||
Square Foot Construction Costs | |||||||||
Group (2018 International Building Code) | IA | IB | HA | MB | MIA | 1MB | IV | VA | VB |
A-1 Assembly, theaters, with stage | $247.86 | $239.47 | $233.25 | $223.81 | $210.17 | $204.10 | $216.62 | $195.46 | $188.40 |
A-1 Assembly, theaters, without stage | $227.10 | $218.71 | $212.49 | $203.05 | $189.41 | $183.34 | $195.86 | $174.70 | $167.65 |
A-2 Assembly, nightclubs | $191.96 | $186.56 | $182.12 | $174.70 | $164.94 | $160.39 | $168.64 | $149.29 | $144.33 |
A-2 Assembly, restaurants, bars, banquet halls | $190.96 | $185.56 | $180.12 | $173.70 | $162.94 | $159.39 | $167.64 | $147.29 | $143.33 |
A-3 Assembly, churches | $229.69 | $221.30 | $215.08 | $205.64 | $192.37 | $187.27 | $198.45 | $177.66 | $170.60 |
A-3 Assembly, general, community halls, libraries, museums | $192.20 | $183.81 | $176.59 | $168.15 | $153.51 | $148.44 | $160.96 | $138.80 | $132.75 |
A-4 Assembly, arenas | $226.10 | $217.71 | $210.49 | $202.05 | $187.41 | $182.34 | $194.86 | $172.70 | $166.65 |
B Business | $200.26 | $192.96 | $186.54 | $177.38 | $161.90 | $155.84 | $170.40 | $142.43 | $136.08 |
E Educational | $209.90 | $202.64 | $196.82 | $188.34 | $175.49 | $166.60 | $181.86 | $153.45 | $148.75 |
F-1 Factory and industrial, moderate hazard | $117.60 | $112.19 | $105.97 | $101.84 | $91.54 | $87.26 | $97.61 | $75.29 | $70.95 |
F-2 Factory and industrial, low hazard | $116.60 | $111.19 | $105.97 | $100.84 | $91.54 | $86.26 | $96.61 | $75.29 | $69.95 |
H-1 High Hazard, explosives | $109.99 | $104.58 | $99.35 | $94.22 | $85.14 | $79.87 | $89.99 | $68.89 | N.P. |
H234 High Hazard | $109.99 | $104.58 | $99.35 | $94.22 | $85.14 | $79.87 | $89.99 | $68.89 | $63.56 |
H-5 HPM | $200.26 | $192.96 | $186.54 | $177.38 | $161.90 | $155.84 | $170.40 | $142.43 | $136.08 |
1-1 Institutional, supervised environment | $197.83 | $191.05 | $185.12 | $177.91 | $163.28 | $158.81 | $178.06 | $146.98 | $142.33 |
I-2 Institutional, hospitals | $335.53 | $328.23 | $321.81 | $312.65 | $296.45 | N.P. | $305.67 | $276.99 | N.P. |
I-2 Institutional, nursing homes | $233.12 | $225.82 | $219.40 | $210.24 | $195.51 | N.P. | $203.26 | $176.05 | N.P. |
I-3 Institutional, restrained | $227.71 | $220.41 | $213.99 | $204.83 | $190.84 | $183.78 | $197.85 | $171.37 | $163.02 |
I-4 Institutional, day care facilities | $197.83 | $191.05 | $185.12 | $177.91 | $163.28 | $158.81 | $178.06 | $146.98 | $142.33 |
M Mercantile | $142.95 | $137.54 | $132.11 | $125.68 | $115.38 | $111.83 | $119.62 | $99.73 | $95.77 |
R-1 Residential, hotels | $199.70 | $192.92 | $186.99 | $179.78 | $164.90 | $160.43 | $179.93 | $148.60 | $143.96 |
R-2 Residential, multiple family | $167.27 | $160.49 | $154.56 | $147.35 | $133.71 | $129.23 | $147.50 | $117.40 | $112.76 |
R-3 Residential, one- and two-family | $155.84 | $151.61 | $147.83 | $144.09 | $138.94 | $135.27 | $141.72 | $130.04 | $122.46 |
R-4 Residential, care/assisted living facilities | $197.83 | $191.05 | $185.12 | $177.91 | $163.28 | $158.81 | $178.06 | $146.98 | $142.33 |
S-1 Storage, moderate hazard | $108.99 | $103.58 | $97.35 | $93.22 | $83.14 | $78.87 | $88.99 | $66.89 | $62.56 |
S-2 Storage, low hazard | $107.99 | $102.58 | $97.35 | $92.22 | $83.14 | $77.87 | $87.99 | $66.89 | $61.56 |
U Utility, miscellaneous | $84.66 | $79.81 | $74.65 | $71.30 | $64.01 | $59.80 | $68.04 | $50.69 | $48.30 |