(A) Compliance with other laws. Obtaining a right-of-way permit does not relieve permittee of its duty to obtain all other necessary permits, licenses and authority and to pay all fees required by the city or other applicable rule, law or regulation. A permittee shall comply with all requirements of local, state and federal laws, including M.S. §§ 216D.01 through 216D.09, as amended from time to time (Gopher One Call excavation notice system). A permittee shall perform all work in conformance with all applicable codes and established rules and regulations, and is responsible for all work done in the right-of-way pursuant to its permit, regardless of who does the work.
(B) Prohibited work. Except in an emergency, and with the approval of the city, no right-of-way obstruction or excavation may be done when seasonally prohibited or when conditions are unreasonable for the work.
(C) Interference with right-of-way.
(1) A permittee shall not so obstruct a right-of-way that the natural free and clear passage of water through the gutters or other waterways shall be interfered with, unless otherwise approved by the Superintendent of Streets.
(2) Private vehicles of those doing work in the right-of-way may not be parked within or next to a permit area, unless parked in conformance with city parking regulations. The loading or unloading of trucks must be done solely within the defined permit area unless specifically authorized by the permit.
(D) Traffic control. A permittee shall implement traffic control measures in the area of the work and shall use traffic control procedures in accordance with the most recent manuals on uniform traffic control, traffic control devices and traffic zone layouts published by the state.
(Ord. 235, passed 10-4-2000)