§ 51.25 TAPPING FEES.
   Each user, at the time he or she is connected with the waterworks system, shall pay a charge to cover the cost of: excavating and tapping the main; furnishing and installing service pipe from the main to the lot line; finishing and installing corporation and stop cocks and furnishing and installing meter crock (if outside), yoke, and meter. The charge for a three-quarter inch meter shall be $500. The charge for a tap larger than three-quarter inch meter tap shall be the cost of labor, materials, power, machinery, transportation, and overhead incurred for installing the tap, but shall not be less than the charge for a three-quarter inch tap.
(Ord. 1-2017, passed 2-21-2017)