(A) No person shall make any excavation into, under, or across any pavements (paved or unpaved), gutters, or curbs within the public rights-of-way under the city jurisdiction without first obtaining a street cut permit from the City Zoning Office. Each street cut shall require a separate street cut permit.
(B) The edges of all excavations into paved or finished pavements, gutters, and curbs shall be sawed to a minimum depth of one-third the depth of the pavement, gutter, or curb. In no case will the sawed cut be allowed to be less than two inches.
(C) All excavations or cuts made into, under, across, or extending three feet from the finished edges of pavements, gutters, or curbs shall be back filled with flowable fill, also known as controlled density fill.
(D) All materials, cuts, and excavations, unless specifically stated otherwise, shall be in accordance with the current State Department of Transportation (INDOT) standard specifications.
(Ord. 2001-12, passed 2-5-2002) Penalty, see § 153.99