(A) The utility should submit, through the County Roads Department, a request to have its facility attached to the bridge, a statement describing alternative methods, and their relative costs, of getting the facility over or around the obstacle, and a description of the facility including the weight per foot of its contents. Details relative to the contents such as pressure, voltage, current, flammability, freeze point, and temperature should be included.
(B) Appropriate devices to protect the bridge and the facility such as valves, circuit breakers, and pressure sensors should be provided and explained. The proposed method of attachment should be described with the aid of sketches detailing the proposed horizontal and vertical alignment. High quality drawings will be required at this point in time.
(C) The cost of the utility facility installation, including the additional bridge engineering and modifications, will be borne by the utility company. The County Roads Department reserves the right to approve/disprove the engineering firm performing the modification design.
(Ord. —, passed 6-30-2009)