9.7.1.   Reduction of Nonconformity.
   No nonconforming site element shall be erected, replaced, or modified except to reduce or eliminate the nonconformity. Repair and maintenance of nonconforming site elements is permitted.
   Commentary 01/01/2021: Previous interpretations have ruled that upper floor additions to structures can be constructed within the current (nonconforming) building footprint, provided all other criteria are met.