§ 55.09 STORMWATER MANAGEMENT PLAN AND BMP CONSTRUCTION PLANS SUBMISSION.
   (A)   The stormwater management plan (stormwater plan) and the associated, proposed BMP construction plans and specifications shall be submitted for review in accordance with the site plan submittal requirements of the city code.
   (B)   The BMP construction plans and specifications shall be prepared in accordance with the requirements of this chapter and the current Wayne County Stormwater Control Program.
   (C)   The BMP construction plans and specifications shall be prepared, signed and sealed by a professional engineer licensed in the State of Michigan, who shall certify that the design of all stormwater BMPs meet the requirements of this chapter.
   (D)   No substantive changes shall be made to an approved stormwater plan without review and written approval by the City Engineer. Additional supporting data and a formal plan resubmittal will be required for a thorough review of the stormwater plan and BMP construction plans and specifications to ensure that changes to the plan will comply with the requirements of this chapter. No site construction changes shall be made from the approved plan until the City Engineer approves the changes and issues a formal plan amendment.
   (E)   Compliance with the requirements of this chapter does not eliminate the need for the proprietor to obtain required permits and approvals from county and state agencies.
   (F)   For site condominiums, complete master deed documents (including "exhibits" drawings) must be submitted for the city’s review and approval prior to recording.
(Ord. 22-002, passed 4-11-22)