(A) Upon receipt of an application, the control authority shall review the application, determine and so notify the industrial user of any of the following.
(1) The industrial user is not required to have a wastewater discharge permit.
(2) The application is incomplete or the information only partially satisfies the information and data required by 40 CFR 403.12(a) and (b) or the control authority, and that additional information and data are required, which shall be promptly furnished.
(3) The industrial user is required to have a wastewater discharge permit.
(B) The control authority may withhold issuance of a permit to a significant user which has not submitted an adequate or timely report to the control authority in accordance with the baseline reporting requirements of 40 CFR 403.12(a) and (b). If the control authority determines an industrial user is required to have a wastewater discharge permit and has evaluated and accepted the data furnished, the industrial user will be notified accordingly by certified mail. The notification shall contain a copy of the proposed permit, so marked, for the industrial user's review. An industrial user may contest the determination of the control authority, any term or condition of wastewater discharge permit including modifications thereof, by filing a request for reconsideration in accordance with the procedures set forth in § 52.54 of this chapter. In the event of such request, the contested terms and conditions of the proposed permit shall be stayed pending the control authority's review of contested issues. If the permit is not contested or if the industrial user fails to respond within 20 days after receipt of the proposed permit, the permit may be issued as proposed. A permit shall be issued upon resolution by the control authority of any contested terms or conditions. Only one facility location shall be included in each permit.
(‘83 Code, § 54.07(D)) (Ord. 89-009, passed 8-21-89) Penalty, see § 52.99