§ 53.57 INSTALLATION.
   The village shall design, purchase and install the pump and other materials required for any private wastewater lift station. The design of the lift station, and the specifications for the pump and other components, shall comply with then existing EPA regulations, and shall have, at a minimum, a 24-hour holding capacity.
(Ord. 2004-13, passed 12-1-2004; Ord. 2008-02, passed 2-4-2008; Ord. 2010-07, passed 12-6-2010)