§ 52.03 INSPECTION.
   All water line materials and workmanship must be checked and approved by the Village Inspector before such work and materials can be accepted by the village. No work shall be covered up until the Inspector has checked and approved it.
(Ord. 1996-06, passed 5-6-1996)