Any work requiring a permit shall also require an inspection by the Plumbing Inspector. Notice shall be given by the installer when work is ready for inspection. Any installation not passing inspection shall be corrected by the installer at no cost to the customer.
(1990 Code, § 6-205) (Ord. 62-680, passed 10-22-1962)