§ 150.128 PERMIT.
   Before any mechanical and/or fuel gas equipment is installed, a permit shall be obtained from the office of the Plumbing Inspector. The following schedule of fees shall be used for all permits required under this subchapter:
   (A)   Single-family and two-family residential furnaces, boilers or air conditioning equipment, $20 per unit.
   (B)   Multi-family, institutional, commercial or industrial furnaces, boilers, air conditioning equipment, related duct work, related piping and/or hood suppression systems:
      (1)   First $1,000 cost or contract bid, $20; and
      (2)   Each additional $1,000 or fraction thereof, $10.
(1990 Code, § 6-204) (Ord. 62-680, passed 10-22-1962; Ord. 69-2, passed 1-20-1969; Ord. 82-850, passed 3-15-1982; Ord. 91-1396, passed 3-18-1991; Ord. 04-3068, passed 12-20-2004; Ord. 14-3458, passed 9-15-2014; Ord. 22-3682, passed 10-3-2022)