Backfilling shall be completed by placing the backfill material well up over the top of the trench. For dry backfilling, the material shall be compacted with a roller of an approved type or with the rear of a truck carrying at least five tons until the surface is unyielding. The surface shall then be graded as required.
(1990 Code, § 25-154) (Ord. 62-672, passed 10-1-1962)