§ 152.357 MINIMUM REQUIREMENTS IN FLOOD-PRONE AREAS.
   The Director of Community Development and/or City Engineer or their designees shall review all developments pursuant to §§ 152.310, 152.311, 152.325 through 152.338 and this subchapter to assure that proposals are consistent with the need to minimize or eliminate flood damage. Utilities such as sewer, gas, electric and water shall be located so as to minimize or eliminate flood damage. The developer’s engineer shall show any special treatment to utilities on a utilities plan when any part of a proposed development lies within a flood hazard area.
(Ord. 10-3277, § 5-3.8, passed 1-4-2010; Ord. 17-3538, passed 2-6-2017; Ord. 20-3609, passed 4-6-2020)