§ 153.59 CONSTRUCTION REQUIREMENTS.
   During construction of all public and lot improvements in all phases of development of the subdivision, the following requirements shall be met.
   (A)   All hazards to life and limb and all attractive nuisances shall be fenced or continually supervised to the satisfaction of the Building Official or City Engineer to avoid accidental injury or death. Permanent fencing may be required by the City Engineer, and should be shown on the final plat.
   (B)   Appropriate soil preservation and erosion control methods as determined by the City Engineer and the Zoning Administrator shall be used during all phases of construction when more than 500 square feet of earth will be exposed.
   (C)   Debris including downed trees, stones, junk, trash or waste materials of any sort must be removed prior to issuance of any occupancy permit or full release of the required performance bond.
   (D)   All unpaved areas within the public right-of- way must be sodded or seeded to the satisfaction of the Zoning Administrator and City Engineer, and street trees must be planted within the public right-of-way at one tree, of one and one-half (1½) inch caliper per 35 feet of lot frontage, or portion thereof. Street trees shall be of a native or regionally appropriate species. Existing trees within the public right-of-way may be used to satisfy a portion of this requirement. The developer is responsible for this improvement, which shall be installed prior to full release of the bond and acceptance of the streets.
   (E)   Appropriate permits must be obtained following final subdivision approval and prior to commencement of any phase of construction.
(Ord. O-93-01, passed 1-25-93; Am. Ord. O-12-10, passed 4-9-12) Penalty, see § 153.99