Skip to code content (skip section selection)
Compare to:
16.10.060   Acceptance and filing of a vesting tentative map.
   A.    Terms. Conditions and Concurrent Approvals. General. All other discretionary approvals, as determined by the Director of Development Services such as conditional use permit, development project, site plan, etc., that may be required by the project shall occur prior to, or simultaneously with, map approval at a duly noticed public hearing before the Planning Commission, or City Council on appeal, except as provided in Section 16.10.080 of this chapter.
   B.    Filing and Processing. A vesting tentative map or vesting parcel map shall be filed in the same form and have the same contents, accompanying data and reports, and shall be processed in the same manner as set forth in Chapter 16.02, Division of Land by Tract Map or Chapter 16.03, Division of Land by Parcel Map except as set forth in this chapter.
   C.    Preparation. In addition to all criteria as set forth in Chapters 16.02 and 16.03 of this code for processing a tentative tract or parcel map, the following requirements shall also apply to vesting maps:
      1.    The map shall have the words vesting tentative map boldly printed conspicuously across its face in letters one-half inch minimum in height.
      2.    Details required to be submitted for review with the vesting tentative map may include but not be limited to:
         a.    Height, size and locations of all structures;
         b.    Sewer, water, storm drain and road details;
         c.    Information on building use;
         d.    Detailed grading plans;
         e.    Geological studies/soils test/hydrology;
         f.    Flood control information;
         g.    Architectural renderings;
         h.    Traffic impact studies;
         i.    Noise impact studies;
         j.    Recreational needs analysis.
      3.    It shall be the determination of the Director of Development Services and the City Engineer as to which items shall be required. All the above-referenced criteria shall be fulfilled to the satisfaction of the Director of Development Services and/or the City Engineer as applicable.
(Ord. 2722 (part), 1990).