Skip to code content (skip section selection)
Compare to:
16.07.050   Pipelines and underground facilities.
   A.    All underground facilities located or installed in public rights-of-way in the City shall be constructed and maintained with a depth of cover established by the City Engineer. The City Engineer may determine and require in particular cases, that public safety or convenience requires that depths be variable, facilities be concrete encased, that installations be by jacking, boring and tunneling and the hours and days of work be restricted.
   B.    Whenever construction, reconstruction or maintenance work on any of the public rights-of-way requires the change in grade or alignment of pipeline or conduit, the same shall be immediately moved at the sole expense of the permittee upon the request of the City Engineer.
(Ord. 2722 (part), 1990).