Commission of any of the following acts shall result in revocation of the demolition permit:
(a) Placing any materials and/or equipment in the structure to be demolished when such materials and/or equipment exceed the designed load limit of any floor of the structure;
(b) Blasting, pulling or throwing of walls without the special approval of the building official; or
(c) Violation of any provision of the building code of the city.
(Ord. 7314, § 1(30), passed 3-17-1976)