§ 7-283 REVOCATION OF PERMIT.
   Commission of any of the following acts shall result in revocation of the demolition permit:
   (a)   Placing any materials and/or equipment in the structure to be demolished when such materials and/or equipment exceed the designed load limit of any floor of the structure;
   (b)   Blasting, pulling or throwing of walls without the special approval of the building official; or
   (c)   Violation of any provision of the building code of the city.
(Ord. 7314, § 1(30), passed 3-17-1976)