§ 158.195 UTILITY LOCATION.
   All utility facilities, including, but not limited to, gas, electric power, telephone and CATV cables shall be located underground throughout the subdivision. Wherever existing utility facilities are located aboveground, except where existing on public roads and rights-of-way, they shall be removed and placed underground. All utility facilities existing and proposed throughout the subdivision shall be shown on the preliminary plat. The subdivider shall install underground service lines to each platted lot at no expense to the city. At the discretion of the Planning and Zoning Commission, the requirement for service connections to each lot may be waived in the case of adjoining lots to be retained in a single ownership and intended to be developed for the same primary use.
(Prior Code, § Q-12-1101)