§ 158.180 STORM SEWERS.
   The developer shall make adequate provisions for storm or floodwater runoff channels or basins. Storm sewers, where required, shall be designed by methods approved by the Planning and Zoning Commission, and a copy of design computations shall be submitted along with plans. Inlets shall be provided so that surface water is neither carried across or around any intersection nor for a distance of more than 600 feet in the gutter. When calculations indicate that curb capacities are exceeded at a point, no further allowance shall be made for flow beyond that point, and catch basins shall be used to intercept flow at the point. Surface water drainage patterns shall be shown for each and every lot and block.
(Prior Code, § Q-12-1011)