1155.07 COMPLIANCE WITH STATE AND FEDERAL REGULATIONS.
   (a)    NPDES Permits. The provisions of the National Pollutant Discharge Elimination System (NPDES) Permits, issued by the Ohio EPA, shall be followed. Proof of compliance shall be, but is not limited to, a copy of the Ohio EPA NPDES Permit number, or a letter from the site owner explaining why the NPDES Permit is not applicable. Such written proof will be provided to the City Engineer before a construction permit will be issued.
   (b)    Federal and State Wetland Permits. The provisions of the U.S. Army Corps of Engineers dredge and fill permits for federally-protected wetlands shall be followed. The provisions of Ohio EPA's Isolated Wetlands Permits shall also be followed. Wetlands and other waters of the United States shall be delineated by protocols accepted by the U.S. Army Corps of Engineers and the Ohio EPA at the time of application of these regulations. Written proof of compliance with both permit programs will be provided to the City Engineer prior to final Planning Commission approval. Proof of compliance shall be, but is not limited to, the following:
      (1)    A copy of the U.S. Army Corps of Engineers Individual Permit, if required for the project, showing project approval and any restrictions that apply to site activities; or
      (2)    A site plan showing that any proposed fill of waters of the United States conforms to the general and specific conditions specified in the applicable Nationwide Permit; or
      (3)    A letter from the site owner verifying that a qualified professional has surveyed the site and found no wetlands or other waters of the United States. Such a letter shall be noted on site plans submitted to the City.
         (Ord. 2021-4065. Passed 5-6-21.)