1167.04 PROCEDURE.
   (a)    Applications. Applications for a zoning certificate are available at the Engineering and Zoning Office. Inspector, and when completed are to be filed at such office. Each application shall include the following:
      (1)    Name, address and telephone number of the applicant.
      (2)    Two (2) copies of a scale drawing showing the actual shape and dimensions of the lot to be built upon, or to be changed in use, in whole or in part.
      (3)    The location of the lot, its current use(s), and the zoning district in which it is located.
      (4)    The location of the lot, the lot coverage and the height of any building or structure to be erected or altered.
      (5)    The use proposed for each building, structure or area.
      (6)    The number of dwelling units, commercial uses and industrial uses each building is designed to accommodate, if applicable.
      (7)    The required fee pursuant to Section 1157.16 Fees and Costs.
      (8)    Such other information as is requested by the Zoning Inspector for the effective administration of this Zoning Ordinance.
   (b)    Time Limit. If the zoning certificate is issued for the purpose of constructing a new building, structure, or an addition and such construction is not begun within six (6) months, then the zoning certificate shall be null and void. The permit shall be conspicuously posted on the premises affected by such permit during the construction time. The permit may be valid for six (6) months after date of issuance or until completion of the project within one (1) year after such date. Completion for purposes of this Section means that the finished exterior is in place.
(Ord. 2020-4053. Passed 1-7-21.)