1131.04 DETENTION BASINS.
   (a)    Detention basins shall be a permitted use in R-1, R-2, R-3, R-0, B-2, I-1, I-2 and C zoning Districts.
   (b)    All detention basins shall have a minimum interior side slope horizontal to vertical at a ratio of 4.1 or greater. Exterior side slopes shall be constructed at no less than a 4 to 1 ratio.
   (c)    All detention basins shall meet all minimum setback requirements for the zoning district in which they are located.
   (d)    All detention basins shall be constructed in accordance with the design requirements of a Professional Engineer and shall be approved by the City Engineer prior to obtaining a permit.
   (e)    All detention basins shall either be seeded or some other approved planting or paving and shall be maintained in an appropriate manner.
   (f)    Refilling. The refilling of an area which has been excavated for the development of a detention basin shall be approved by the City Engineer and be considered waste disposal and shall meet the requirements as set forth by the Sandusky County Board of Health for solid waste disposal under Ohio R.C. 3734.04.
(Ord. 2020-4053. Passed 1-7-21.)